Vietin Bank Tower

  • Owner: VIETINBANK​
  • Design consultant: Foster + Partners​
  • Structural engineer: Halvorson and Partners​
  • Location: Hanoi​
  • GFA: 126,257 m2 – 68 F​
  • Certification: LEED 2009 CS & LOTUS NR – Design stage
  • Duration: 2016 – 2018 – Completed
  • Scope: Advice to tenderer on LEED & LOTUS compliance LEED 2009 CS and LOTUS NR

Key Feature/Amenities (profile):

– 2 towers including the 68-story office tower, 48 storey tower with hotel and aparments on top of a podium with retail and conference facilities
– Combined heat and power plant supplying hot water from CHP waste heat
– Use of Groundwater cooling
– Rainwater harvesting
– Dessicant Dehumidification
– Integrated daylight system
– Sky gardens

Vietinbank-tower-1
Vtb-2