Project Information

  • Location: Binh Duong, Vietnam
  • GFA: 4500 m²
  • Certification Type:
  • Certification Target: Energy Simulation
  • Completion Year: 2020
Z2337150847527_71569b8d9d5b998a35c47d2dadb6fc20
Z2337150850058_95220ce20453ad21290e081ab25645d6
Z2337150844328_8be40ddb35755c24b83847de2bb84b15
Z2337150842932_cf23d6964e50ee8dc104c6d02b84f817

BTC Office – An Office Building Applying Energy Simulation for Operational Efficiency

BTC Office is an office building project located in Binh Duong, Vietnam, constructed and put into operation in 2020 with a total gross floor area of 4,500 m². From the early design stage, the project placed strong emphasis on energy efficiency and operational optimization, aiming to create a modern, comfortable, and sustainable working environment.

In the role of energy simulation consultant, VILANDCO supported the project owner in evaluating and optimizing the building’s energy performance through various design and operational scenarios. This approach enables BTC Office to better control energy consumption, improve long-term operational efficiency, and contribute to reducing environmental impact and operating costs for the business.